September 2009 Project List



PROJECT LIST
WO # DESCRIPTION PROJECT MANAGER EST. START EST. COMP.
DORM REVEUE PROJECTS
77262 RENOVATE TO ENLARGE LIVING SPACE, ZURA C-5 FLOOR J BROWN    
 
MAJOR PROJECTS
72310 RENOVATE STORM HALL & NASATIR HALL M WOOMER 7/1/10  
72313 NEW ALUMNI CENTER (@ FOOTBALL OPS SITE) M WOOMER 3/15/08 9/8/09
72314 AZTEC CENTER RENOVATION & EXPANSION WOOMER    
78468 ENGINEERING BUILDING AIR CONDITIONING G VORRARO 6/8/09 10/15/09
90552 BUILD OUT OF 3RD FLOOR, BIOSCIENCE CENTER Q LEE 1/19/09 5/30/09
  ALVARADO HOTEL L COOPER    
  ECO RESIDENCE HALL Q LEE    
  REMINGTON ROAD MEDIAN IMPROVEMENTS @ TENNIS COURTS Q LEE    
  PLAZA LINDA VERDE     9/1/13
 
MINOR CAPITAL OUTLAY
59829 ADA REPAIRS FOR ENS 280 ACCESS C SCHNEIDER    
15866 INSTALL INCLINED LIFT, ENS ANNEX      
 
PARKING AND TRANSPORTATION
91451 NEW HANDICAP PARKING AREA, AZTEC ATHLETIC CENTER J HERR    
 
SPECIAL REPAIR
85870 VIVARIUM REPAIRS, NLS 17 C SCHNEIDER 6/24/09  
15376 REFURBISH COOLING TOWERS, EBA ROOF S HENDERSON    
20460 REPLACE HVAC CONTROL SYSTEM, IVC G VORRARO 7/1/09  
26190 BUILD TRANSFORMER ENCLOSURE, ENS ANNEX MECH ROOM M CULVER    
31418 REPLACE SPLIT SYSTEM, PS 117C S HENDERSON    
31449 RECONFIGURE FIRE ALARM SYSTEM, IVC A MARTIN    
38138 RETAINING WALL SURVEY FOR 09/10, A & L T DOWDY    
45760 REPLACE MEDIUM VOLTAGE SWITCH, ENS ANNEX J MACMILLAN    
 
UTILITIES PROJECTS
31533 CAMPUS UTILITY MASTER PLAN G VORRARO    
50130 MBCX PROJECT, MANCHESTER HALL B LEKAS    
50131 MBCX PROJECT, EBA / CENTRAL CHILL PLANT B LEKAS    
10494 RETROFIT LIGHT FIXTURES TO T-8, IVC A MARTIN    
19085 REPL 472 HIGH FLOW TOILETS & URINALS, CAMPUS      
22864 PRELIM ASSESSMENT AUDIT, ENERGY PROJECTS, CAMPUS G VORRARO    
35247 INSTALL LOW-FLOW AERATORS, CAMPUS      
 
SH / NH RELOCATION PROJECTS
14584 PREP 4TH FLOOR FOR NEW TENANTS, AH T DOWDY 8/1/09 10/1/09
14585 RENOVATE FOR NEW OFFICES, EAST MALL BLDG M CULVER 7/1/09 9/1/09
14761 RENOVATE FOR 4 LECTURE SPACES, COLLEGE SQUARE, 2ND FLOOR I CASTRO   1/6/10
14765 RENOVATE FOR 2 LECTURE SPACES, PG 2ND FL, EAST BALCONY T DOWDY 7/6/09 1/6/10
15767 SITE PREP — 18 TEMP CLASSROOM UNITS, AZTEC MESA (ENS 700) J MACMILLAN    
22871 RENOVATE ROOM, HT 70A & 70C J HERR 9/1/09  
30335 RENOVATE 4TH FLOOR AREAS, LL M CULVER 7/7/09 1/6/10
30339 SITE PREP — 2 TEMPORARY CLASSROOM UNITS, COMM MESA J HERR    
30392 RENOVATE FOR NEW 70 SEAT CLASSROOM, LLA 2203 M CULVER 7/31/09  
32468 MODIFY SPACE, PG 2ND FL, WEST BALCONY T DOWDY 7/6/09 9/6/09
32469 RENOVATE FOR 235 SEAT CLASSROOM, PG 153 T DOWDY 9/6/09 1/6/10
42801 RENOVATE HALLWAY, PG T DOWDY    
43833 CONSTRUCT SIDEWALK, ENS 700, WEST SIDE, CALPULLI TO ENS T DOWDY    
43834 RENOVATE RESTROOMS & MODIFY CORRIDOR FOR ADA, COM M CULVER    
 
DEPARTMENT REQUESTS
83295 UPDATE SIGNAGE & ROOM NUMBERS, IVC J BLAKE    
92035 RENOVATE INTERIOR FOYER / HALLWAY, PP M CULVER 5/10/09  
93581 RENOVATE COMPUTER LAB, EG 221 M CULVER    
93994 RENOVATE HARDY AVE ENTRANCE, GW M CULVER 8/17/09 8/21/09
96837 INST SOLAR SYSTEM ON HILLSIDE, AQUAPLEX E HUTH    
12086 RENOVATE OFFICE, LAB & STORAGE, EG 110 A&B J HERR    
13067 INSTALL DOORS, HARDWARE & CARD ACCESS, NLS BSMT M CULVER    
15813 RENOVATE FOR CASHIERS, SSW 2620 M CULVER 5/26/09 9/1/09
16429 INST SPLIT SYSTEM A/C, COMM 209 J MACMILLAN    
16599 INSTALL CAMPUS PUBLIC ADDRESS SYSTEM A MARTIN 7/6/09 8/10/09
19242 ALUMNI CENTER KITCHEN BUILD-OUT M CASEY 8/13/09  
23710 INSTALL SOLAR WATER HEATER, CAMPUS CHILDREN’S CENTER G GAY    
26445 INSTALL AIR-CONDITIONING, EG 221 C SCHNEIDER 7/12/09  
26611 INSTALL ROOF WITH SOLAR COLLECTOR, ARC MEETING CENTER 101 E HUTH    
29606 INSTALL SPLIT SYSTEM AIR-CONDITIONG, PY 342 M CULVER    
30337 RENOVATE FOR FUTURE STUDENT SPACE, LLA 2ND FL J BROWN    
30393 MOVE LIBRARY ADMIN OFFICES TO LL 5TH FLOOR      
31489 INSTALL CARD ACCESS, BIOSCIENCE 3RD FLOOR      
32070 INST MAG DOOR RELEASE & CONNECT TO FIRE ALARM SYSTEM, KPBS J MACMILLAN    
32475 INSTALL UPS SYSTEM, MT LAGUNA, 40” TELESCOPE A MARTIN    
32562 RENOVATE SUITE, EBA 451C M CULVER    
33292 INSTALL LANTRONICS, CARD ACCESS SYSTEM, CAMPUS A MARTIN 7/1/09  
33293 INSTALL FIRMWARE CHIPS, CARD ACCESS SYSTEM, CAMPUS A MARTIN 7/1/09  
34031 INSTALL SINK & CABINETS, SSW 3640 M CULVER    
34732 CREATE 38 SDS CART PICKUP LOCATIONS, CAMPUS J BLAKE    
34825 RENOVATE FOR KCR RADIO, COMM 122 J HERR 10/1/09  
36312 RENOVATE FOR 7 GROUP STUDY ROOMS, LL 3RD FLOOR M CULVER    
36546 RENOVATE ROOM, CSL 122 M CULVER    
39874 REMOVE CAGE & BUILD ENCLOSURE, CALPULLI GARAGE M CULVER    
39894 RENOVATE FOR 4 SMART CLASSROOMS, IVC      
39977 RENOVATE FOR HUMAN RESOURCES, ESC 4TH FLOOR M CULVER 7/27/09  
41427 REFURBISH AIR HANDLERS, KPBS / GW, PHASE 2      
41457 RENOVATE FOR DIGITAL MASTER CONTROL ROOM, KPBS 1113 & 1113J      
42947 RENOVATE COMPUTER CENTER, EBA 111 A MARTIN    
43822 INSTALL AIR CONDITIONING, LL 405A M BOBAK 10/1/09  
43890 INSTALL ADDITIONAL ELECTRIC FOR EQUIPMENT, NLS 26 J MACMILLAN    
43948 INST PHASE II EXPANSION OF PV SOLAR SYSTEM, AQUAPLEX E HUTH    
45138 LEAD ABATEMENT, ENS 200 M CULVER    
45655 FUME HOOD TESTING, INST AIR-FLOW DEVICES, CAMPUS G VORRARO    