| DORM REVEUE PROJECTS |
| 77262 |
RENOVATE TO ENLARGE LIVING SPACE, ZURA C-5 FLOOR |
J BROWN |
|
|
| |
| MAJOR PROJECTS |
| 72310 |
RENOVATE STORM HALL & NASATIR HALL |
M WOOMER |
7/1/10 |
|
| 72313 |
NEW ALUMNI CENTER (@ FOOTBALL OPS SITE) |
M WOOMER |
3/15/08 |
9/8/09 |
| 72314 |
AZTEC CENTER RENOVATION & EXPANSION |
WOOMER |
|
|
| 78468 |
ENGINEERING BUILDING AIR CONDITIONING |
G VORRARO |
6/8/09 |
10/15/09 |
| 90552 |
BUILD OUT OF 3RD FLOOR, BIOSCIENCE CENTER |
Q LEE |
1/19/09 |
5/30/09 |
| |
ALVARADO HOTEL |
L COOPER |
|
|
| |
ECO RESIDENCE HALL |
Q LEE |
|
|
| |
REMINGTON ROAD MEDIAN IMPROVEMENTS @ TENNIS COURTS |
Q LEE |
|
|
| |
PLAZA LINDA VERDE |
|
|
9/1/13 |
| |
| MINOR CAPITAL OUTLAY |
| 59829 |
ADA REPAIRS FOR ENS 280 ACCESS |
C SCHNEIDER |
|
|
| 15866 |
INSTALL INCLINED LIFT, ENS ANNEX |
|
|
|
| |
| PARKING AND TRANSPORTATION |
| 91451 |
NEW HANDICAP PARKING AREA, AZTEC ATHLETIC CENTER |
J HERR |
|
|
| |
| SPECIAL REPAIR |
| 85870 |
VIVARIUM REPAIRS, NLS 17 |
C SCHNEIDER |
6/24/09 |
|
| 15376 |
REFURBISH COOLING TOWERS, EBA ROOF |
S HENDERSON |
|
|
| 20460 |
REPLACE HVAC CONTROL SYSTEM, IVC |
G VORRARO |
7/1/09 |
|
| 26190 |
BUILD TRANSFORMER ENCLOSURE, ENS ANNEX MECH ROOM |
M CULVER |
|
|
| 31418 |
REPLACE SPLIT SYSTEM, PS 117C |
S HENDERSON |
|
|
| 31449 |
RECONFIGURE FIRE ALARM SYSTEM, IVC |
A MARTIN |
|
|
| 38138 |
RETAINING WALL SURVEY FOR 09/10, A & L |
T DOWDY |
|
|
| 45760 |
REPLACE MEDIUM VOLTAGE SWITCH, ENS ANNEX |
J MACMILLAN |
|
|
| |
| UTILITIES PROJECTS |
| 31533 |
CAMPUS UTILITY MASTER PLAN |
G VORRARO |
|
|
| 50130 |
MBCX PROJECT, MANCHESTER HALL |
B LEKAS |
|
|
| 50131 |
MBCX PROJECT, EBA / CENTRAL CHILL PLANT |
B LEKAS |
|
|
| 10494 |
RETROFIT LIGHT FIXTURES TO T-8, IVC |
A MARTIN |
|
|
| 19085 |
REPL 472 HIGH FLOW TOILETS & URINALS, CAMPUS |
|
|
|
| 22864 |
PRELIM ASSESSMENT AUDIT, ENERGY PROJECTS, CAMPUS |
G VORRARO |
|
|
| 35247 |
INSTALL LOW-FLOW AERATORS, CAMPUS |
|
|
|
| |
| SH / NH RELOCATION PROJECTS |
| 14584 |
PREP 4TH FLOOR FOR NEW TENANTS, AH |
T DOWDY |
8/1/09 |
10/1/09 |
| 14585 |
RENOVATE FOR NEW OFFICES, EAST MALL BLDG |
M CULVER |
7/1/09 |
9/1/09 |
| 14761 |
RENOVATE FOR 4 LECTURE SPACES, COLLEGE SQUARE, 2ND FLOOR |
I CASTRO |
|
1/6/10 |
| 14765 |
RENOVATE FOR 2 LECTURE SPACES, PG 2ND FL, EAST BALCONY |
T DOWDY |
7/6/09 |
1/6/10 |
| 15767 |
SITE PREP — 18 TEMP CLASSROOM UNITS, AZTEC MESA (ENS 700) |
J MACMILLAN |
|
|
| 22871 |
RENOVATE ROOM, HT 70A & 70C |
J HERR |
9/1/09 |
|
| 30335 |
RENOVATE 4TH FLOOR AREAS, LL |
M CULVER |
7/7/09 |
1/6/10 |
| 30339 |
SITE PREP — 2 TEMPORARY CLASSROOM UNITS, COMM MESA |
J HERR |
|
|
| 30392 |
RENOVATE FOR NEW 70 SEAT CLASSROOM, LLA 2203 |
M CULVER |
7/31/09 |
|
| 32468 |
MODIFY SPACE, PG 2ND FL, WEST BALCONY |
T DOWDY |
7/6/09 |
9/6/09 |
| 32469 |
RENOVATE FOR 235 SEAT CLASSROOM, PG 153 |
T DOWDY |
9/6/09 |
1/6/10 |
| 42801 |
RENOVATE HALLWAY, PG |
T DOWDY |
|
|
| 43833 |
CONSTRUCT SIDEWALK, ENS 700, WEST SIDE, CALPULLI TO ENS |
T DOWDY |
|
|
| 43834 |
RENOVATE RESTROOMS & MODIFY CORRIDOR FOR ADA, COM |
M CULVER |
|
|
| |
| DEPARTMENT REQUESTS |
| 83295 |
UPDATE SIGNAGE & ROOM NUMBERS, IVC |
J BLAKE |
|
|
| 92035 |
RENOVATE INTERIOR FOYER / HALLWAY, PP |
M CULVER |
5/10/09 |
|
| 93581 |
RENOVATE COMPUTER LAB, EG 221 |
M CULVER |
|
|
| 93994 |
RENOVATE HARDY AVE ENTRANCE, GW |
M CULVER |
8/17/09 |
8/21/09 |
| 96837 |
INST SOLAR SYSTEM ON HILLSIDE, AQUAPLEX |
E HUTH |
|
|
| 12086 |
RENOVATE OFFICE, LAB & STORAGE, EG 110 A&B |
J HERR |
|
|
| 13067 |
INSTALL DOORS, HARDWARE & CARD ACCESS, NLS BSMT |
M CULVER |
|
|
| 15813 |
RENOVATE FOR CASHIERS, SSW 2620 |
M CULVER |
5/26/09 |
9/1/09 |
| 16429 |
INST SPLIT SYSTEM A/C, COMM 209 |
J MACMILLAN |
|
|
| 16599 |
INSTALL CAMPUS PUBLIC ADDRESS SYSTEM |
A MARTIN |
7/6/09 |
8/10/09 |
| 19242 |
ALUMNI CENTER KITCHEN BUILD-OUT |
M CASEY |
8/13/09 |
|
| 23710 |
INSTALL SOLAR WATER HEATER, CAMPUS CHILDREN’S CENTER |
G GAY |
|
|
| 26445 |
INSTALL AIR-CONDITIONING, EG 221 |
C SCHNEIDER |
7/12/09 |
|
| 26611 |
INSTALL ROOF WITH SOLAR COLLECTOR, ARC MEETING CENTER 101 |
E HUTH |
|
|
| 29606 |
INSTALL SPLIT SYSTEM AIR-CONDITIONG, PY 342 |
M CULVER |
|
|
| 30337 |
RENOVATE FOR FUTURE STUDENT SPACE, LLA 2ND FL |
J BROWN |
|
|
| 30393 |
MOVE LIBRARY ADMIN OFFICES TO LL 5TH FLOOR |
|
|
|
| 31489 |
INSTALL CARD ACCESS, BIOSCIENCE 3RD FLOOR |
|
|
|
| 32070 |
INST MAG DOOR RELEASE & CONNECT TO FIRE ALARM SYSTEM, KPBS |
J MACMILLAN |
|
|
| 32475 |
INSTALL UPS SYSTEM, MT LAGUNA, 40” TELESCOPE |
A MARTIN |
|
|
| 32562 |
RENOVATE SUITE, EBA 451C |
M CULVER |
|
|
| 33292 |
INSTALL LANTRONICS, CARD ACCESS SYSTEM, CAMPUS |
A MARTIN |
7/1/09 |
|
| 33293 |
INSTALL FIRMWARE CHIPS, CARD ACCESS SYSTEM, CAMPUS |
A MARTIN |
7/1/09 |
|
| 34031 |
INSTALL SINK & CABINETS, SSW 3640 |
M CULVER |
|
|
| 34732 |
CREATE 38 SDS CART PICKUP LOCATIONS, CAMPUS |
J BLAKE |
|
|
| 34825 |
RENOVATE FOR KCR RADIO, COMM 122 |
J HERR |
10/1/09 |
|
| 36312 |
RENOVATE FOR 7 GROUP STUDY ROOMS, LL 3RD FLOOR |
M CULVER |
|
|
| 36546 |
RENOVATE ROOM, CSL 122 |
M CULVER |
|
|
| 39874 |
REMOVE CAGE & BUILD ENCLOSURE, CALPULLI GARAGE |
M CULVER |
|
|
| 39894 |
RENOVATE FOR 4 SMART CLASSROOMS, IVC |
|
|
|
| 39977 |
RENOVATE FOR HUMAN RESOURCES, ESC 4TH FLOOR |
M CULVER |
7/27/09 |
|
| 41427 |
REFURBISH AIR HANDLERS, KPBS / GW, PHASE 2 |
|
|
|
| 41457 |
RENOVATE FOR DIGITAL MASTER CONTROL ROOM, KPBS 1113 & 1113J |
|
|
|
| 42947 |
RENOVATE COMPUTER CENTER, EBA 111 |
A MARTIN |
|
|
| 43822 |
INSTALL AIR CONDITIONING, LL 405A |
M BOBAK |
10/1/09 |
|
| 43890 |
INSTALL ADDITIONAL ELECTRIC FOR EQUIPMENT, NLS 26 |
J MACMILLAN |
|
|
| 43948 |
INST PHASE II EXPANSION OF PV SOLAR SYSTEM, AQUAPLEX |
E HUTH |
|
|
| 45138 |
LEAD ABATEMENT, ENS 200 |
M CULVER |
|
|
| 45655 |
FUME HOOD TESTING, INST AIR-FLOW DEVICES, CAMPUS |
G VORRARO |
|
|