| DORM REVEUE PROJECTS |
| 64875 |
REPLACE FIRE DOORS @ LANDINGS 1-8, TENOCHCA |
J BROWN |
|
|
| 77262 |
RENOVATE TO ENLARGE LIVING SPACE, ZURA C-5 FLOOR |
J BROWN |
|
|
| 92975 |
RENOVATE MEETING ROOM & HALLWAY, TULA COMM CENTER |
J BROWN |
|
|
| |
| MAJOR PROJECTS |
| 91448 |
TELECOM INFRASTRUCTURE IMPROVEMENTS |
KRAFT/MCKELVEY |
2/15/05 |
12/31/07 |
| 56441 |
REPL 4 AIR HANDLERS & MECHANICAL EQUIP, LL ROOF |
C SCHNEIDER |
3/15/08 |
12/15/08 |
| 56442 |
REPLACE ROOF, UPGRADE ELECTRICAL & PLUMBING, LL ROOF |
C SCHNEIDER |
3/15/08 |
12/15/08 |
| 56443 |
SEISMIC STUDY OF LOVE LIBRARY STRUCTURE |
L COOPER |
|
|
| 72310 |
RENOVATE STORM HALL & NASATIR HALL |
L COOPER |
2/1/10 |
|
| 72311 |
RENOVATE SHS FOR SPEECH LANGUAGE HEARING |
C KRAFT |
3/1/08 |
8/1/08 |
| 72312 |
INTERNATIONAL STUDENT CENTER ADDITION |
C KRAFT |
11/1/07 |
8/30/08 |
| 72313 |
ALUMNI CENTER (@ FOOTBALL OPS SITE) |
M WOOMER |
3/15/08 |
6/30/09 |
| 72314 |
AZTEC CENTER RENOVATION & EXPANSION |
WOOMER |
9/1/09 |
9/1/11 |
| 78466 |
LOVE LIBRARY MECHANICAL PHASE 3 |
C SCHNEIDER |
3/15/08 |
9/1/08 |
| 78468 |
ENGINEERING BUILDING AIR CONDITIONING |
C SCHNEIDER |
7/15/08 |
9/15/08 |
| 81987 |
RENOVATE ELEVATORS 1 THRU 5, LL |
A MARTIN |
|
|
| |
ALVARADO HOTEL |
L. COOPER |
|
|
| |
ECO RESIDENCE HALL |
KRAFT |
|
|
| |
REMINGTON ROAD MEDIAN IMPROVEMENTS @ TENNIS COURTS |
C KRAFT |
6/1/08 |
8/1/08 |
| |
BUILD OUT DENTAL OFFICE, CALPULLI CENTER |
M WOOMER |
6/1/08 |
10/30/08 |
| |
| MINOR CAPITAL OUTLAY |
| 15024 |
CONSTRUCT CAMPANILE RECREATIONAL FIELD, 700 FIELD |
T DOWDY |
|
|
| 25121 |
INSTALL NEW PASSENGER ELEVATOR, CSL |
A MARTIN |
10/1/07 |
1/31/08 |
| 30179 |
REALIGN CYLINDER CASING, CSL FREIGHT ELEVATOR |
A MARTIN |
|
|
| 56445 |
ADA ACCESSIBILITY IMPROVEMENTS, MT LAGUNA VISITOR’S CTR |
T DOWDY |
|
|
| 59829 |
ADA REPAIRS FOR ENS 280 ACCESS |
C SCHNEIDER |
|
|
| 78469 |
BIOSCIENCE PUNCH THRU TO NLS, LAB CHANGES 408 |
J HERR |
|
5/15/08 |
| 78470 |
RENOVATE FOR NURSING, AH 2ND FLOOR, NORTH |
I CASTRO |
5/20/08 |
8/31/08 |
| 78471 |
MODERNIZATION, MT LAGUNA OBSERVATORY |
T DOWDY |
|
|
| 78472 |
IVC AUDITORIUM SEATING & HVAC |
C SCHNEIDER |
|
|
| 78485 |
CREATE ADA RESTROOMS, AH 2ND FLOOR, NORTH |
M CULVER |
|
5/1/08 |
| 94147 |
INSTALL INCLINED LIFT, ENS ANNEX |
C SCHNEIDER |
|
|
| 98199 |
RENOVATE LOCK HARDWARE FOR ADA, MT LAGUNA |
|
|
|
| |
| PARKING AND TRANSPORTATION |
| |
ENS PARKING LOT |
|
|
|
| |
| SPECIAL REPAIR |
| 75934 |
REPLACE ROOF, NORTH LIFE SCIENCE |
T DOWDY |
|
|
| 85870 |
VIVARIUM REPAIRS |
C SCHNEIDER |
|
|
| 28081 |
REPLACE TILE IN ARCHWAY, HEPNER HALL |
|
|
|
| 33409 |
REPLACE CONCRETE @ SUNDIAL |
T DOWDY |
|
|
| 33412 |
REPAIR WALKWAYS, DRAMATIC ARTS — MUSIC |
|
|
|
| 33415 |
REPAIR PAVERS, CENTENNIAL MALL |
|
|
|
| 56433 |
PAINT BUILDING EXTERIORS, MT LAGUNA |
T DOWDY |
5/12/08 |
|
| 56434 |
REPLACE ROOFS, DORMITORY & SHOP, MT LAGUNA |
T DOWDY |
|
|
| 58938 |
ROOF CORRECTIONS, NORTH LIFE SCIENCE |
T DOWDY |
|
|
| 59869 |
RETROFIT EXTERIOR LIGHTING, AH |
J MACMILLAN |
|
|
| 72303 |
INST SOLEXX ROOF ON GREENHOUSE, NLS |
T DOWDY |
|
|
| 87128 |
POWER DISTRIBUTION UPGRADE, OAT |
A MARTIN |
|
6/1/08 |
| 87292 |
REPLACE ROOF, EG |
T DOWDY |
|
|
| 10491 |
REPLACE FIRE ALARM SYSTEM, IVC STUDENT UNION |
A MARTIN |
|
|
| 10492 |
REPLACE DOORS & HARDWARE, IVC LIBRARY & LIB ADDN |
A MARTIN |
|
|
| 10493 |
REPLACE TRANSFORMER & SWITCHGEAR, IVC AUDITORIUM |
A MARTIN |
|
|
| |
| UTILITIES PROJECTS |
| 31533 |
CAMPUS UTILITY MASTER PLAN |
G VORRARO |
|
3/31/08 |
| 35519 |
INST VARIABLE SPEED DRIVES, SSW ROOF |
B LEKAS |
|
1/15/08 |
| 35522 |
INST VARIABLE SPEED DRIVES, KPBS GW ROOF |
B LEKAS |
|
1/15/08 |
| 50130 |
MBCX PROJECT, MANCHESTER HALL |
B LEKAS |
|
|
| |
| ADA SIGNAGE PROJECTS |
| 55697 |
UPDATE INTERIOR ADA SIGNAGE, SSE & SSW |
J BLAKE |
|
6/30/08 |
| 55703 |
UPDATE EXTERIOR ADA SIGNAGE, N ART & S ART |
J BLAKE |
|
|
| |
| DEPARTMENT REQUESTS |
| 81291 |
REPAIR AZTEC CIRCLE DR, PP TO BAM |
|
|
|
| 83295 |
UPDATE SIGNAGE & ROOM NUMBERS, IVC |
J BLAKE |
|
|
| 10761 |
LANDSCAPE WEST TROLLEY PORTAL |
J RODRIGUEZ |
|
|
| 10765 |
SCRIPP’S TERRACE STABILIZATION |
|
|
|
| 22828 |
INSTALL ELEVATOR #9, LLA |
A MARTIN |
|
|
| 25988 |
MONITOR GROUND MOVEMENT, CHILD CARE CENTER |
C KRAFT |
|
|
| 35521 |
INST ENERGY EFFICIENT LED LAMPS, “A” LOT SIGN |
B LEKAS |
6/1/08 |
|
| 45928 |
PATH IMPROVEMENTS, ARTS & LETTERS |
T DOWDY |
|
|
| 61175 |
PAINT 3RD & 4TH FLOORS, GATEWAY |
|
|
|
| 63923 |
WIND TUNNEL DRAIN MODIFICATIONS, EG 20 |
|
|
|
| 68157 |
ART WALKWAY CANOPIES, NORTH ART, 5TH FLOOR |
|
|
|
| 71617 |
REPLACE AWNING IN YARD, ENGINEERING |
J HERR |
|
|
| 76528 |
RECONSTRUCT SOIL BINS, CONSTRUCT MEZZANINE, IT 101/103 |
|
|
|
| 77127 |
BUILD OUT VIVARIUM, BIOSCIENCE 15-18 |
J HERR |
|
|
| 78490 |
RENOVATE FOR SMART LAB CONVERSION, PA 121 |
J HERR |
|
|
| 78554 |
REPAIR/REPLACE SEATING, SSW 1500 |
J BROWN |
|
|
| 82190 |
CALPULLI SIGNAGE, PHASE 3 |
J BLAKE |
|
|
| 82441 |
INSTALL RAISED FLOOR, ENSA 1 |
J HERR |
|
|
| 83038 |
RENOVATE RACQUETBALL COURTS FOR WOMEN’S CREW |
J MACMILLAN |
|
|
| 86368 |
RENOVATE OFFICES, AD 222 |
|
3/24/08 |
5/30/08 |
| 86375 |
RENOVATE AREA, SSE 2307 |
M CULVER |
|
|
| 88264 |
ENHANCE SOUTH BOOKSTORE EXTERIOR |
M CASEY |
5/27/08 |
7/11/08 |
| 89192 |
REPLACE WOODEN STAIRS, OAT |
J HERR |
|
|
| 89282 |
RENOVATE AREA, AD 320, 326 |
J HERR |
8/30/08 |
|
| 89637 |
RENOVATE FOR DINING SERVICES OFFICE, ED 112 |
M CULVER |
|
5/21/08 |
| 89699 |
PREP ROOM FOR CSUEU OFFICE SPACE, COM 122 |
M CULVER |
4/7/08 |
5/14/08 |
| 90173 |
INSTALL UTILITIES FOR COFFEE CART, LITTLE THEATRE |
J MACMILLAN |
|
|
| 90241 |
RENOVATE FOR VETERAN’S AFFAIRS, ED 151, 151B |
M CULVER |
|
5/30/08 |
| 90287 |
PATHWAY FROM TNS CLOSET TO EAST WING, CALPULLI |
J MACMILLAN |
|
|
| 90552 |
BUILD OUT OF 3RD FLOOR, BIOSCIENCE CENTER |
C KRAFT |
9/1/08 |
2/10/09 |
| 92002 |
DEMO & REPLACE FLOORING, EAST COMMONS FOOD COURT |
M CASEY |
5/27/08 |
6/20/08 |
| 92134 |
RENOVATE OFFICES & RECEPTION AREA, EG 323, 328C |
M CULVER |
|
|
| 92496 |
PREP ROOM FOR MONTEZUMA PUBLISHING, IT 104 |
M CULVER |
|
5/25/08 |
| 93247 |
INST ELECTRICAL FOR DPS 911 PROJECT |
J MACMILLAN |
|
|
| 93580 |
SOUND PROOF ROOM, MUSIC 217 |
J HERR |
|
|
| 93581 |
RENOVATE COMPUTER LAB, EG 221 |
|
|
|
| 93994 |
RENOVATE HARDY AVE ENTRANCE, GW |
|
|
|
| 94608 |
REPLACE ROOF, COX ARENA |
J BROWN |
|
|
| 94609 |
REPLACE ROOF, ARC, TICKET OFFICE, CLASSROOM BLDGS |
J BROWN |
|
|
| 10112 |
RENOVATE ROOM, MUSIC 110A |
|
|
|
| 10113 |
RENOVATE ROOMS, MUSIC 4 & 5 |
|
|
|
| 10114 |
RENOVATE ROOM, MUSIC 250 |
|
|
|